- Contractors/Suppliers :ASN
- Repeatered system, 64
- Capacity 8 FP; 8.4 Tbps; 105 Lambdas; 10 Gbps; initial 160 Gbps
- Length 3,200 km
- Landing Points : Chennai (Madras) India, Tuas Singapore
- Owners: Bharti, SingTel
- CAPEX USD 250 mn
- RFS / Commercial Traffic: May 2002
- Contract Award: October 2000
- Construction : late 2000 - April 2002
- Wholesale capacity is available in STM-1, -4, -16, and -64 levels; 10-Gbit/sec wavelengths; and dark fiber, which can support 40-960 Gbits/sec.
- It was a plan to branch to Medan ?? (see below - at that time, Indosat would not let this happened :-D )
- A terrestrial link between Chennai and Mumbai (2,000 km - inlcudes in Phase-1 / USD 250 mn??)
Another version (source Apman):
- Length : 3,200 km
- Capacity : 8,400 Gbps ; (8 fp x 105 wl @ 10 Gbps)
- RFS : 2001